Description
Rapidflow’s trailered concrete hose-pump technology.
Please Note:
– Travel time – Port to Port is charged at the hourly rate.
– Off-site washout (for job sites in which a suitable washout area cannot be not provided): One hour pump time at applicable hourly rate + $150 waste concrete/slurry disposal fee.
– Pump washout/prime-out bags can be supplied at a charge of $195 per unit {customer is responsible for disposal of bag and its contents).
– $25 primer fee for all line-pump jobs
– Overtime charge of $75 per hour applicable to all hours (including travel and washout time) prior to 7:00AM and after 3:00PM Monday-Friday as well as all day Saturday/Sunday.
– Pump jobs requiring over 150′ of line – add $95 line rental/delivery fee
– Pump jobs requiring more than 250′ of line – add $245 line rental/delivery fee/extra labourer
– Jobs cancelled with less than 8 hours’ notice will be subject to a $300 cancellation fee. Jobs cancelled with less than 4 hours’ notice will be subject to the hourly minimum charge.
– In the event of a breakdown, Concrete Pumping Service will repair the equipment in as timely a manner as possible. An alternative concrete delivery method may be required. We will not be liable for any
back-charges due to lost time or wasted material. For guaranteed performance, a standby pump is recommended.
* For more information regarding available equipment and services please visit our website www.rapidflow.ca or email [email protected] Call or Text 519-827-5240